MIKOTON — IT CONSULTING & ENGINEERING

We tighten development and operations practices

We set up releases, monitoring, infrastructure, and integrations so the team spends less time on manual routine and finds issues earlier.

Releases, infrastructure, and support often depend on manual steps and tribal knowledge. We help lock in delivery and operations practices, connect the tools, and reduce day-to-day operational load.

Release pipelineDEV-318 · GitLab CI · interface example
Commit
branch → MR
Build
queued
Tests
running
Deploy
staging → prod
Monitoring
alerts to chat
tracker → GitLab CI → prod · one flow, statuses visible to the team
04 — DEVELOPMENT MANAGEMENT

Tracker and CI/CD in one path

We set up task management — Jira, YouTrack, Kaiten, or your tracker — and connect it to build and release pipelines. Every commit follows one path from branch to production without improvised handoffs.

05 — INFRASTRUCTURE

Hardware sized for load, without the wrong bet

We define server and storage requirements, check compatibility, and plan for growth. We prepare the specification — procurement goes through partners while we stay on the client side.

Procurement specificationfor 1C + analytics workload · example
CPU2 × Xeon Silver 4410Y, 12C✓ compatible
Memory256 GB DDR5 ECC, 8 × 32✓ headroom per spec
Storage2 × 3.84 TB NVMe + 4 × 8 TB SAS✓ capacity headroom
Redundancy2 × PSU, IPMI, NBD warrantyper spec
delivery via partner network · we represent the client

DIAGNOSTIC TOOLS

Start with a diagnostic

Assess delivery, operations and infrastructure. Get an immediate preliminary result, priorities and a PDF report.

Materials and tools

Production Readiness Assessment

Assess CI/CD, testing, deployment, rollback, observability and recovery readiness.

  • Repository and branching
  • Build, tests, and artifacts
  • Environments and secrets

8–12 minutes · Immediate result · PDF report

Start the assessment

Server and storage selection brief

Load, storage, growth, resilience, backup, and delivery constraints.

  • Load and growth profile
  • Storage and reserve requirements
  • Resilience and recovery

8–12 minutes · Immediate result · PDF report

Start the brief
  • Immediate result after completion
  • Downloadable PDF report
  • No obligation to start a project

Do releases and support still depend on manual steps?

We will map where the path from commit to production breaks, review the checks and alerts already in place, and prioritize the first improvements.

You can start with a diagnostic before any implementation commitment.

We usually reply within one business day.